A confidential prospective buyer engaged Imperion to assess the major utility systems at a Central Valley dairy processing facility under consideration for acquisition. The assessment reviewed refrigeration, compressed air, steam and hot water, wastewater, and boiler systems, air quality permitting and compliance considerations, along with historical utility usage and billing, to provide a clear picture of the facility’s current condition and operating risks. The assessment served as part of the prospective buyer’s due diligence, helping identify potential liabilities and future capital needs before acquisition.
The assessment identified several areas requiring attention, including system inefficiencies, potential safety concerns, aging assets, maintenance practices, and regulatory compliance risks. Imperion also identified opportunities to improve system performance and reduce operational costs, such as addressing compressed air leaks, optimizing wastewater treatment, upgrading legacy refrigeration equipment and improving steam, hot water, and boiler system efficiency. These findings provided insight into potential near-term and long-term costs that could affect the value and future operation of the facility.
The assessment provided the prospective buyer with a clearer understanding of the facility’s condition, potential liabilities and opportunities for improvement, supporting a more informed acquisition decision and future capital planning. Identifying these considerations prior to acquisition also provided the prospective buyer with technical information to support transaction discussions and negotiations.